skip to content
Browse
My DL
My Slideshows
My Favorites
Slideshows
Preferences
About
Help
Advanced Search
View Cart
DIGITAL LIBRARY
Search results for
Galveston
Refine your search
Creator
Frazier, Rex Dunbar [p...
(85)
Date
1915?
(66)
August 18, 1915
(13)
October 18, 1915
(3)
August 16, 1915
(2)
September 28, 1915
(1)
results
1
-
20
of
85
item(s)
page 1 of 5 : (
<<
1
2
3
4
5
>>
) ::
previous
:
next
select all
:
clear all
:
add to favorites
Image:
Title:
Description:
1.
Crew repairing track at Texas City junction
A crew works at repairing the railroad track around Texas City junction.
2.
Man with the remains of his home
A man lies in a cot, surrounded by the debris from his former home.
3.
Man by a stranded gas buoy
A man stands in front of a stranded gas buoy from the Galveston entrance.
4.
Crew works beside the reconstructed track at Oyster
A repairing crew works beside the Interurban railroad at Oyster on Galveston Island during reconstruction.
5.
Gas buoy stranded on land by hurricane
A stranded gas buoy from the Galveston entrance is found stranded in a field after the hurricane.
6.
Work car before going onto temporary trestle
A work car from the Interurban railroad that went down with the Causeway during the hurricane, after being righted and preparatory to lifting to the temporary trestle.
7.
Broadway at 21st Street looking east
Broadway and 21st Street intersection, looking east on broadway at the buildings. Pedestrians walk the streets after the hurricane.
8.
Causeway Inn wreckage
Causeway Inn wreckage on the Santa Fe right-of-way at Virginia Point with an Interurban railroad in the background.
9.
Causeway wreckage from arched bridge toward the island
Causeway wreckage, including some twisted Interurban railroad tracks, from arched bridge toward Galveston Island.
10.
Close-up of an Interurban passenger car
Close-up view of an Interurban passenger car after the hurricane.
11.
Columbo Cafe and Casino Wreckage
Colombo Cafe and Casino wreckage on Beach Boulevard after the hurricane.
12.
Crew working to rebuild the Interurban at Oyster
Crew working to rebuild the Interurban railroad at Oyster on Galveston Island during reconstruction.
13.
Reconstructing the overhead at Oyster
Crews work to reconstruct the overhead for the Interurban railroad at Oyster on Galveston Island.
14.
Crews replacing riprap at Seawall
Crews work to replace riprap along the Seawall.
15.
Rogers' Oyster Resort
Debris where Rogers' Oyster Resort stood before the hurricane.
16.
Building damage on the east end of Seawall Boulevard
East end of Seawall Boulevard. Debris is scattered in front of a building damaged by the hurricane.
17.
East end of Seawall Boulevard
East end of Seawall Boulevard. Sidewalk slabs can be seen in the foreground of the picture with damaged houses in the background.
18.
Train crossing temporary trestle (wide view)
First Interurban train to cross the temporary trestle under its own power two months after the hurricane.
19.
Train crossing temporary trestle
First Interurban train to cross the temporary trestle under its own power two months after the hurricane.
20.
Train crossing temporary trestle (close-up)
First Interurban train to cross the temporary trestle under its own power two months after the hurricane.
select all
:
clear all
:
add to favorites
results
1
-
20
of
85
item(s)
page 1 of 5 : (
<<
1
2
3
4
5
>>
) ::
previous
:
next